The Hybrid Data Pipeline server must be installed before installing the On-Premises Connector.
Take the following steps before proceeding with an installation of the On-Premises Connector.
Exit or close all applications to prevent file-locking conflicts.
If you are upgrading an existing installation, stop the On-Premises Connector services before performing the upgrade. To stop the services, from the Windows Start Menu, select Stop Services in the On-Premises Connector program group.
If you are deploying Hybrid Data Pipeline behind a load balancer, configure the load balancer according to the instructions in Load balancer configuration.
During installation of the Hybrid Data Pipeline server, four configuration and certificate files are generated. For a standalone deployment, these files are located in the Hybrid Data Pipeline installation directory <install_dir>/redist. For a load balancer deployment, these files are stored in a key location specified during installation. These files must be copied to the directory from which the On-Premises Connector installation program will be run. The files are: