skip to main content
Installing the Hybrid Data Pipeline On-Premises Connector : Before installing the On-Premises Connector
  

Try Now

Before installing the On-Premises Connector

The Hybrid Data Pipeline server must be installed before installing the On-Premises Connector.
Take the following steps before proceeding with an installation of the On-Premises Connector.
*Exit or close all applications to prevent file-locking conflicts.
*If you are upgrading an existing installation, stop the On-Premises Connector services before performing the upgrade. To stop the services, from the Windows Start Menu, select Stop Services in the On-Premises Connector program group.
*If you are deploying Hybrid Data Pipeline behind a load balancer, configure the load balancer according to the instructions in Load balancer configuration.
*During installation of the Hybrid Data Pipeline server, four configuration and certificate files are generated. For a standalone deployment, these files are located in the Hybrid Data Pipeline installation directory <install_dir>/redist. For a load balancer deployment, these files are stored in a key location specified during installation. These files must be copied to the directory from which the On-Premises Connector installation program will be run. The files are:
*config.properties
*OnPremise.properties
*ddcloud.pem
*ddcloudTrustStore.jks